I was quite surprised that they introduced a new scheduler and replaced CFS with it in the same step. I would have expected it to become available, then default, then replace CFS. But I guess this should be interpreted as indicating they have tested it extensively already, with very low chance of significant regressions.
I was quite surprised that they introduced a new scheduler and replaced CFS with it in the same step. I would have expected it to become available, then default, then replace CFS. But I guess this should be interpreted as indicating they have tested it extensively already, with very low chance of significant regressions.